Please select your language

Pelham Structures relies on Hundegger technology for more than 30 years

Pelham Structures is one of the leading timber frame manufacturers in the UK. For more than 30 years, the company has consistently invested in advanced timber construction technology – becoming the first UK business to install a Hundegger K2 and most recently expanding production with a SPEED‑Cut SC3.

Pelham Structures: Over 30 years of investment in timber frame construction and Hundegger technology

Pelham Structures is a trusted leader in timber frame construction in the United Kingdom, delivering high‑performance, energy‑efficient homes for more than three decades. Founded in 1993 by Bill Bampton, the company combines modern offsite manufacturing with practical, build‑focused design – relying on Hundegger technology from an early stage.

Early adoption of CAD/CAM joinery

Pelham Structures was the first company in the UK to install a Hundegger K2 CAD/CAM joinery machine. This early investment marked a major step forward in the efficient and precise production of complex timber frames, enabling architecturally ambitious and energy‑efficient homes to be delivered cost‑effectively to a wider market.

Notably, the original Hundegger K2 machine is still in operation today – a clear testament to the durability, reliability and long‑term performance of Hundegger technology.

Integrated approach with a clear focus on quality

Beyond manufacturing, Pelham Structures has expanded into residential development, combining timber frame production with speculative and supported self‑build projects. This integrated model ensures that every frame benefits from real‑world experience in buildability, performance and long‑term value.

The company produces both open‑panel systems and pre‑insulated closed‑panel solutions, tailored to individual design and thermal requirements. All systems exceed current building control standards while maximising usable living space.

Increased capacity through continued investment

Continued investment remains central to Pelham Structures’ strategy. The construction of a new factory, combined with the installation of a Hundegger SPEED‑Cut SC3 and Wood Tech assembly tables, has significantly increased offsite manufacturing capacity. This strengthens efficiency, quality and sustainability across the production process.

A strong, long‑term partnership

“Pelham Structures are strong advocates of the benefits timber frame construction brings to modern developments,” says Chris Osborne, Hundegger UK. “Over the years, they have developed a highly specified closed‑panel system engineered for maximum efficiency, precision and sustainability. Bill Bampton’s early decision to invest in the first Hundegger machine delivered to the UK speaks volumes – particularly as that machine is still in productive use today.”

Looking ahead

Supported by certifications such as ISO 9001, CATG Frame Mark, and the STA Assure Gold Standard, Pelham Structures continues to invest in people, processes and machinery. By combining advanced manufacturing technology with skilled craftsmanship, the company remains committed to delivering high‑quality timber homes that stand the test of time.